Behro's Timeline

Behro consulting engineers was established in 1987 based on the need of Tehran metropolis to design and construct metro lines with the metro strategies of Tehran Urban and Suburban Railway Company and was registered in 2001 carrying several years of experience by a group of experienced engineers. Since its establishment, Behro consulting engineers has tried to institutionalize metro engineering as a collection of specialized knowledge in various technical fields, taking advantage of the latest scientific achievements.

The result of Behro's decades of activity as the main consultant of Tehran metro lines, is high abilities of design, quality control, supervision, design management and MC services; which in recent years offered extensive services to urban railway projects of other metropolises such as Karaj, Isfahan, Shiraz and Rasht.

Behro now offers a wide range of various technical and engineering specialties, including structural, architecture and railway engineering, traffic and geotechnics, mechanical engineering and all electrical engineering majors (telecommunications, control and power), rolling stock engineering and operation, and several other interdisciplinary disciplines. Includes.

In addition, the years of experience in MC and consulting for Tehran metro, high capabilities of supervision and quality control of execution and commissioning, as well as advanced contract services and project management, control and guidance has been added to Behro so that now a wide range of specialties concentrated and coordinated to provide services in various railway, civil, equipment and rolling stock projects.

Year

Month

Item (Project involved)

Behro Position

2001

October

Official registration and establishment of the company

---

2005

June

Supplying 105 and 119 AC cars for Tehran metro lines 1& 2

MC and supervision

2005

June

Supplying 48, 30, 10, 160 (totally 248) cars and 12, 4, 8, 38 (totally 62) locomotives for Tehran metro line 5 (Tehran – Karaj)

MC and supervision

2005

June

Supplying 77 DC cars for Tehran metro line 2

MC and supervision

2006

March

Tehran metro line 4 equipment

MC

2006

March

Tehran metro line 3 equipment

MC & supervision

2006

March

Tehran metro lines 1, 2 and 5 equipment

MC & supervision

2006

September

Ekbatan parking, Kolahdooz depot, tunnel and several stations, substations and ventilators in Tehran metro line 4

MC and supervision

2007

June

Supplying 455 steel & Aluminum cars for Tehran metro lines 1& 2

MC

2007

May

Civil, equipment, rolling stock and operation of Tehran metro line 7

MC

2007

October

Golshahr Commercial-Office Complex

Designer

2008

February

Tehran metro line 6

MC

2008

July

Equipment of Tehran metro line 2 east extension (Start)

Supervision

2010

May

Tramway of district 22 of Tehran (Start)

Consulting Engineering

2011

March

Tramway of district 12 of Tehran (Start)

Consulting Engineering

2011

June

Tramway of district 12 of Tehran (End)

Consulting Engineering

2012

March

Equipment of Karaj metro line 2

MC

2012

March

Tramway of district 22 of Tehran (End)

Consulting Engineering

2013

July

F2 & I2 stations in Karaj metro line 2

Design and supervision

2014

September

Equipment of Tehran metro line 2 east extension (End)

supervision

2015

March

Azadi underpass

Designer

2015

April

Supplying of rolling stock for Shiraz metro lines

MC and supervision

2015

August

Extension of Tehran metro line 7 project contract

MC

2016

January

Urmia traffic studies

MC

2016

February

Civil, equipment, rolling stock and operation of Tehran metro line 6

MC

2017

January

Tehran metro line 5 (Tehran – Karaj) Improvement

Supervision

2017

April

Preparation of tender documents and tender management in

Supplying 630 cars for Tehran metro lines

MC

2017

December

Appointment of Mr. Gholamreza Shamsi as CEO of the company

---

2018

September

Organizing the entrance and creating a covered corridor of the passenger terminal of Shahid Haqqani port

Designer

2018

September

Rasht tramway line 1

Designer

2018

November

Supplying of rolling stock for Tehran metro lines 3, 4, 6 & 7

MC and supervision

2018

November

Providing Database for Tehran Metro Approved Vendor List (AVL)

Technical consultant

2019

March

Shahed station in Isfahan metro line 2

Design and supervision

2019

March

Evaluate and manage employee performance

---

2019

May

Supplying 70 Aluminum cars for Tehran metro lines

MC and supervision

2019

November

Several complexes in Tehran

Designer

2019

November

Submission of basic design studies and Notification of detail design in Rasht tramway project

Designer

2020

February

Ebn-e-Sina station in Isfahan metro line 2

Design and  supervision

2020

April

Focus on developing intellectual capital and improving the quality of services

---

2020

May

Change the company name

---

2020

July

Esfahan Metro rolling stock

consulting and supervising

2020

October

Tabriz Metro rolling stock

consulting and supervising

2021

January

Establishment of an integrated management system (IMS)

---

2021

 

Participation in tenders / projects abroad

---


Share to