Shiraz Urban Railway Organization

Preliminary studies of Shiraz public transportation system were carried out by a foreign consultant in 1976 and then new studies of Shiraz city were carried out by a group of university faculty members in 1990 confirming the need to use railway network as the development of public transportation system.

In order to complete and compile comprehensive studies of Shiraz public transportation, previous studies were reviewed in 1999 and suitable routes for metro lines were presented and finally the best option selected.

مترو شیراز

Shiraz urban railway organization was established in 2001 and the executive operation of Shiraz metro line 1 started in 2002.

6 metro lines has been considered for Shiraz, of which only one line has been commissioned so far. This line is 24.5 km long and its 5-car trains are approximately 100 meters long. Specifications of Shiraz metro lines are given in the following table:

Line

Length (km)

No. of Stations

No. of Trains Required

1

24.5

20

43

2

15.1

13

29

3

11.7

8

24

4

17

17

32

5

10

9

20

6

15

14

29

In order to supply the required trains of Shiraz metro line 1, several options have been taken, one of which is the project of supplying 4 metro trains. The engineering and supervision of this project was assigned to Behro Consulting Engineers Company.

Main specification of Shiraz metro line 1 trains

Main specification of Shiraz metro line 1 trains are as follows:

Train Length

about 100 m

Train Width

2600 mm

Max. Train Operation Speed

80 km/h

Voltage

1500 V.DC

No. of Cars

5

Train Configuration

3M2T

No. of doors in each side of car

4