Tehran Metro line 10

Behro Consulting Engineers, as employer consultant in civil, equipment, Rolling Stock and operation engineering, plays a key role in leading and supervising the project.

Project Description

The approximate length of Tehran Metro Line 10 is 44 km which has intersection with most of existing lines (lines 1, 3, 4, 5, 6 and 7) and future lines of Tehran Metro network. This line starts in the east of Tehran in the area of Tehranpars 2nd square (intersection with the eastern extension of line 4) and along Babaei highway goes to the west and intersects Bagheri, Imam Ali and Sayyad Shirazi highways. The project route intersects at Nobonyad station with Tehran metro line 3. Then, the route has intersection with Shahid Sadr Station in metro line 1, crosses Modares Highway, Parkway intersection, Chamran Highway, International Exhibition, Kaj Square, Sarv Street, intersection with metro line 7  at Meydan-e Ketab Station. The route passes through Kouhestan Boulevard, Abshnasan highway, Shahran and Kouhsar Boulevards, it will intersect with Kouhsar station in metro line 6. Then, crossing Hemmat and Azadegan Highways, it intersects with metro line 9 and goes west to District 22 of Tehran Municipality along 9th Yas Street, Austria Square, Sahel Square, Jozani Boulevard and northern side of Chitgar Lake and it will connect to Vardavard metro station in Tehran metro line 5.

Tehran Railway Master Plan Review
Tehran Railway Master Plan Review

Project specification

Item

Description

Length

44 km

No. of stations

35

Length of platform

140 m

Width of platform

4 m

Station width

14 m

Intersection with other lines

7 intersections (with lines 1, 3, 4, 5, 6, 7 & 9)


Specifications of the first executive section

The executive operation has started in the first section of line 10 with a length of 14.5 km, between Daryacheh Square and Ketab Square. This section includes 12 stations, the specifications of which are presented in the table below.

Station Name

Location

Mileage

Status

Remarks

Z10-5

Meydan-e Daryacheh

38+200

Being Operated

TBM1 entrance shaft

Z10-4

Meydan-e Sahel

37+200

Unopened


Z10-3

Kashan Blvd

36+200

Unopened


Z10-2

Meydan-e Otrish

34+800

Being Operated


Z10-1

Azadegan

33+800

Unopened


Z10

Dehkadeh-ye-Olympic

32+700

Unopened

Backup shaft TBM1

Z6Y10

Koohsar

30+800

Being Operated

Intersection with line 6

X10

Jannat Abad

28+800

Unopened


W10

Iranshahr

28+000

Unopened


V10

Sardar-e Jangal

26+700

Unopened


U10

Ashrafi Esfahani

25+900

Unopened

TBM2 Backup shaft

T10

Meydan-e Ketab

23+700

Being Operated

Intersection with line 7


Execution activities of this section such as surveying, geotechnical operations, TBM overhaul, execution and execution of Daryacheh station piles, etc. are underway. For conducting geotechnical studies of the route and stations in this area, 39 exploratory boreholes and 25 manual wells has been considered. The following table summarizes the number and conditions of experiments considered in Line 10 geotechnical studies.

Specifications of the first executive phase of Tehran Metro Line 10

Also, the overhaul of TBM and excavation of Daryacheh shaft as the TBM entrance were carried out according to a specific schedule, which is presented in some pictures below.


 Gallery of line 10
 خط10 ایستگاه دریاچه
Executive operation of phase one of Tehran Metro Line 10
Phase one of Tehran Metro Line 10
TBM line 10
Construction of Tehran Metro Line 10
Beginning of the executive operation of the first section of Tehran Metro Line 10
Tehran Metro Line 10 Lake Station