Training webinar on estimating working chest pressure by limit balance method

Cooperation between Behro Consulting Engineers and Iran Tunnel Association

  • Subject: estimating tunnel face pressure by Limit Equilibrium Method In mechanized excavation of the southern extension of Tehran Metro Line 6
  • Presenter: Dr. Ebrahim Farrokh; senior consultant of Behro Consulting Engineers in mechanized drilling (Faculty Member of Amirkabir University of Technology)
  • Date: Wednesday, 2020/12/16, 16:00 – 18:00

To download the webinar presentation file, go to the Iran Tunnel Association website (click here).

Share to   

Recent posts